دوره 7، شماره 3 - ( 4-1396 )                   جلد 7 شماره 3 صفحات 393-411 | برگشت به فهرست نسخه ها


XML English Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Kaveh A, Vazirinia Y. TOWER CRANES AND SUPPLY POINTS LOCATING PROBLEM USING CBO, ECBO, AND VPS. International Journal of Optimization in Civil Engineering. 2017; 7 (3) :393-411
URL: http://ijoce.iust.ac.ir/article-1-305-fa.html
TOWER CRANES AND SUPPLY POINTS LOCATING PROBLEM USING CBO, ECBO, AND VPS. دانشگاه علم و صنعت ایران. 1396; 7 (3) :393-411

URL: http://ijoce.iust.ac.ir/article-1-305-fa.html


چکیده:   (725 مشاهده)

Tower cranes are major and expensive equipment that are extensively used at building construction projects and harbors for lifting heavy objects to demand points. The tower crane locating problem to position a tower crane and supply points in a building construction site for supplying all requests in minimum time, has been raised from more than twenty years ago. This problem has already been solved by linear programming, but meta-heuristic methods spend less time to solving the problem. Hence, in this paper three newly developed meta-heuristic algorithms called CBO, ECBO, and VPS have been used to solve the tower crane locating problem. Three scenarios are studied to show the applicability and performance of these meta-heuristics.

متن کامل [PDF 616 kb]   (340 دریافت)    
نوع مطالعه: پژوهشي | موضوع مقاله: Optimal design
دریافت: ۱۳۹۵/۱۲/۸ | پذیرش: ۱۳۹۵/۱۲/۸ | انتشار: ۱۳۹۵/۱۲/۸

کلیه حقوق این وب سایت متعلق به دانشگاه علم و صنعت ایران می باشد.

طراحی و برنامه نویسی : یکتاوب افزار شرق

© 2015 All Rights Reserved | Iran University of Science & Technology

Designed & Developed by : Yektaweb