Csébfalvi A. A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS. International Journal of Optimization in Civil Engineering. 2012; 2 (3) :341-355
URL: http://ijoce.iust.ac.ir/article-1-95-fa.html
A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS. دانشگاه علم و صنعت ایران. 1391; 2 (3) :341-355

URL: http://ijoce.iust.ac.ir/article-1-95-fa.html


چکیده:   (2598 مشاهده)
In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The essence and viability of our unified model are illustrated by fuzzy examples presented in the recent fuzzy RCPSP literature.
متن کامل [PDF 152 kb]   (1556 دریافت)    
نوع مطالعه: پژوهشي | موضوع مقاله: Optimal design
دریافت: ۱۳۹۱/۵/۱۳

کلیه حقوق این وب سایت متعلق به دانشگاه علم و صنعت ایران می باشد.

طراحی و برنامه نویسی : یکتاوب افزار شرق

© 2015 All Rights Reserved | Iran University of Science & Technology

Designed & Developed by : Yektaweb