Volume 3, Issue 4 (10-2013)                   2013, 3(4): 527-542 | Back to browse issues page

XML Print


Abstract:   (14507 Views)
This paper, we presents a new primary-secondary-criteria scheduling model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations (UD) and cash flows (UC). The RCPSP-UD-UC approach producing a “robust” resource-feasible schedule immunized against uncertainties in the activity durations and which is on the sampling-based scenarios may be evaluated from a cost-oriented point of view. In the presented approach, it is assumed that each activity-duration and each cash flow value is an uncertain-but-bounded parameter, which is characterized by its optimistic and pessimistic estimations. The evaluation of a given robust schedule is based on the investigation of variability of the makespan as a primary and the net present value (NPV) as secondary criterion on the set of randomly generated scenarios given by a sampling-on-sampling-like process. Theoretically, the robust schedule-searching algorithm is formulated as a mixed integer linear programming problem, which is combined with a cost-oriented sampling-based approximation phase. In order to illustrate the essence of the proposed approach we present detailed computational results for a larger and very challenging project instance. A problem specific fast and efficient harmony search algorithm for large uncertain problems will be presented in a forthcoming paper.
Full-Text [PDF 173 kb]   (5293 Downloads)    
Type of Study: Research | Subject: Optimal design
Received: 2013/10/12 | Accepted: 2013/11/19 | Published: 2013/11/19

Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.