<?xml version="1.0" encoding="utf-8"?>
<journal>
<title>International Journal of Optimization in Civil Engineering</title>
<title_fa>عنوان نشریه</title_fa>
<short_title>IJOCE</short_title>
<subject>Engineering &amp; Technology</subject>
<web_url>http://ijoce.iust.ac.ir</web_url>
<journal_hbi_system_id>18</journal_hbi_system_id>
<journal_hbi_system_user>agent2</journal_hbi_system_user>
<journal_id_issn>2228-7558</journal_id_issn>
<journal_id_issn_online>3060-8236</journal_id_issn_online>
<journal_id_pii></journal_id_pii>
<journal_id_doi>doi</journal_id_doi>
<journal_id_iranmedex></journal_id_iranmedex>
<journal_id_magiran></journal_id_magiran>
<journal_id_sid></journal_id_sid>
<journal_id_nlai></journal_id_nlai>
<journal_id_science></journal_id_science>
<language>en</language>
<pubdate>
	<type>jalali</type>
	<year>1392</year>
	<month>7</month>
	<day>1</day>
</pubdate>
<pubdate>
	<type>gregorian</type>
	<year>2013</year>
	<month>10</month>
	<day>1</day>
</pubdate>
<volume>3</volume>
<number>4</number>
<publish_type>online</publish_type>
<publish_edition>1</publish_edition>
<article_type>fulltext</article_type>
<articleset>
	<article>


	<language>en</language>
	<article_id_doi></article_id_doi>
	<title_fa></title_fa>
	<title>ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS I. A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA APPROACH </title>
	<subject_fa>Optimal design</subject_fa>
	<subject>Optimal design</subject>
	<content_type_fa>پژوهشي</content_type_fa>
	<content_type>Research</content_type>
	<abstract_fa></abstract_fa>
	<abstract>This paper, we presents a new primary-secondary-criteria scheduling model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations (UD) and cash flows (UC). The RCPSP-UD-UC approach producing a “robust” resource-feasible schedule immunized against uncertainties in the activity durations and which is on the sampling-based scenarios may be evaluated from a cost-oriented point of view. In the presented approach, it is assumed that each activity-duration and each cash flow value is an uncertain-but-bounded parameter, which is characterized by its optimistic and pessimistic estimations. The evaluation of a given robust schedule is based on the investigation of variability of the makespan as a primary and the net present value (NPV) as secondary criterion on the set of randomly generated scenarios given by a sampling-on-sampling-like process. Theoretically, the robust schedule-searching algorithm is formulated as a mixed integer linear programming problem, which is combined with a cost-oriented sampling-based approximation phase. In order to illustrate the essence of the proposed approach we present detailed computational results for a larger and very challenging project instance. A problem specific fast and efficient harmony search algorithm for large uncertain problems will be presented in a forthcoming paper.</abstract>
	<keyword_fa></keyword_fa>
	<keyword>project scheduling; scheduling under uncertainty; robustness</keyword>
	<start_page>527</start_page>
	<end_page>542</end_page>
	<web_url>http://ijoce.iust.ac.ir/browse.php?a_code=A-10-66-15&amp;slc_lang=en&amp;sid=1</web_url>


<author_list>
	<author>
	<first_name>S.</first_name>
	<middle_name></middle_name>
	<last_name>Danka</last_name>
	<suffix></suffix>
	<first_name_fa></first_name_fa>
	<middle_name_fa></middle_name_fa>
	<last_name_fa></last_name_fa>
	<suffix_fa></suffix_fa>
	<email></email>
	<code>18003194753284600607</code>
	<orcid>18003194753284600607</orcid>
	<coreauthor>Yes
</coreauthor>
	<affiliation></affiliation>
	<affiliation_fa></affiliation_fa>
	 </author>


</author_list>


	</article>
</articleset>
</journal>