<?xml version="1.0" encoding="utf-8"?>
<journal>
<title>International Journal of Optimization in Civil Engineering</title>
<title_fa>عنوان نشریه</title_fa>
<short_title>IJOCE</short_title>
<subject>Engineering &amp; Technology</subject>
<web_url>http://ijoce.iust.ac.ir</web_url>
<journal_hbi_system_id>18</journal_hbi_system_id>
<journal_hbi_system_user>agent2</journal_hbi_system_user>
<journal_id_issn>2228-7558</journal_id_issn>
<journal_id_issn_online>3060-8236</journal_id_issn_online>
<journal_id_pii></journal_id_pii>
<journal_id_doi>doi</journal_id_doi>
<journal_id_iranmedex></journal_id_iranmedex>
<journal_id_magiran></journal_id_magiran>
<journal_id_sid></journal_id_sid>
<journal_id_nlai></journal_id_nlai>
<journal_id_science></journal_id_science>
<language>en</language>
<pubdate>
	<type>jalali</type>
	<year>1394</year>
	<month>5</month>
	<day>1</day>
</pubdate>
<pubdate>
	<type>gregorian</type>
	<year>2015</year>
	<month>8</month>
	<day>1</day>
</pubdate>
<volume>5</volume>
<number>3</number>
<publish_type>online</publish_type>
<publish_edition>1</publish_edition>
<article_type>fulltext</article_type>
<articleset>
	<article>


	<language>en</language>
	<article_id_doi></article_id_doi>
	<title_fa></title_fa>
	<title>JOINT ECONOMIC LOT SIZING PROBLEM IN A TWO ECHELON PRODUCTION SYSTEM WITH FINITE PRODUCTION RATE AND LEAD TIME</title>
	<subject_fa>Optimal design</subject_fa>
	<subject>Optimal design</subject>
	<content_type_fa>پژوهشي</content_type_fa>
	<content_type>Research</content_type>
	<abstract_fa></abstract_fa>
	<abstract>
In  this  study,  a  two-echelon  supplier-manufacturer  system  with  finite  production  rate  and 
lead  time  is  proposed.  It  is  assumed  that  shortage  is  not  permitted  and  the  lot  size  of 
manufacturer  (second  echelon)  is  m-factors  of  the  lot  size  of  supplier  (first  echelon)  and 
supplier can supply the manufacturer’s lot size in several shipments in each cycle. So, the 
production  rate  of  supplier  is  greater  than  manufacturer’s.  The  proposed  model  aims  to 
determine  the  optimal  lot-size  of  each  echelon  such  that  the  total  cost  of  system  is 
minimized. First, the problem is studied regardless of lead time and the optimal value of the 
lot sizes and the number of shipments is determined through analytical relations. Then, an 
exact solution algorithm for the problem is presented for the case with non-zero lead time. 
Finally, the performance of the proposed algorithm is reviewed by solving some numerical 
instances of the problem.
</abstract>
	<keyword_fa></keyword_fa>
	<keyword>Inventory control,  Joint economic lot  sizing,  multi echelon production systems, finite production rate.</keyword>
	<start_page>375</start_page>
	<end_page>389</end_page>
	<web_url>http://ijoce.iust.ac.ir/browse.php?a_code=A-10-66-73&amp;slc_lang=en&amp;sid=1</web_url>


<author_list>
	<author>
	<first_name>Y.</first_name>
	<middle_name></middle_name>
	<last_name>Malekian </last_name>
	<suffix></suffix>
	<first_name_fa></first_name_fa>
	<middle_name_fa></middle_name_fa>
	<last_name_fa></last_name_fa>
	<suffix_fa></suffix_fa>
	<email></email>
	<code>18003194753284600849</code>
	<orcid>18003194753284600849</orcid>
	<coreauthor>No</coreauthor>
	<affiliation></affiliation>
	<affiliation_fa></affiliation_fa>
	 </author>


	<author>
	<first_name>S.H. </first_name>
	<middle_name></middle_name>
	<last_name>Mirmohammadi</last_name>
	<suffix></suffix>
	<first_name_fa></first_name_fa>
	<middle_name_fa></middle_name_fa>
	<last_name_fa></last_name_fa>
	<suffix_fa></suffix_fa>
	<email></email>
	<code>18003194753284600850</code>
	<orcid>18003194753284600850</orcid>
	<coreauthor>Yes
</coreauthor>
	<affiliation></affiliation>
	<affiliation_fa></affiliation_fa>
	 </author>


</author_list>


	</article>
</articleset>
</journal>
